Monument/I-680 Bicycle and Pedestrian Improvement Study
The TRANSPAC Committee is developing a feasibility study to identify specific improvements to the bicycle and pedestrian connections on the Monument Boulevard Corridor across I-680. This is a heavily-traveled roadway, including high-speed freeway ramps, with minimal facilities for non-motorists. The TRANSPAC Committee has partnered with CCTA to assist in contracting and administering the study.
This gap in the active transportation network was identified in the Countywide Bike Plan, and would provide for an improved east-west connection along Monument Boulevard between Downtown Pleasant Hill and the Iron Horse Trail, including through the I-680 interchange (Monument Blvd. between Mohr Lane/Iron Horse Trail and Contra Costa Blvd). and includes other equivalent parallel routes used to travel and access this section of the Monument Corridor.
Your valuable input is needed to highlight issues and opportunities that could be evaluated through this study. Use the link below access an interactive webmap to leave your comments along specific points of the study corridor.
The timeframe for accepting input has ended. Thanks to all who participated in the study.